a4yy午夜福利网在线观看,久久久久亚洲av成人无码,亚洲最大的成人网,成人性生生活性生交久,精品国内片67194,少妇bbb好爽,在线观看av网站永久,西西午夜无码大胆啪啪国模
News
NEWS
動態(tài)信息
Lean empowerment! Steel mills unite force, strong execution, lean production results!

Lean management is the internal requirement of high-quality transformation and development, and it is also an effective means to enhance the competitiveness of enterprises. Hebei Xinda Iron and Steel Group Co., Ltd. under the leadership of Ren Haibing as the core of the steel plant, the use of lean thinking, focus on task promotion, through a series of lean management measures, the first three quarters of 2024, the average cost reduction of all steel grades is 4.37 yuan/ton, to ensure the completion of indicators optimization and efficiency improvement tasks.

Fine process control

Practice Lean "winning chess"

Steel mills focus on the key, clear responsibility to grasp the main body, according to the heat balance reasonable slag material, stable operation, control spatter, silicon high manganese blast furnace reasonable use of double slag operation, to avoid large spatter. Strengthen the communication between sections, control the temperature reasonably according to the time of pressing steel, control the pouring of large and medium ladle, divide the pouring stop and block the flow of the billet, reduce the cutting head and tail of the casting billet. Formulate plans to improve the converter one-down rate and carbon temperature hit rate, refine rewards and punishments, and improve the awareness of personnel in key positions of the converter.

At the same time, focusing on the factors affecting the consumption of iron and steel materials and iron-containing materials, break the whole into pieces and break them one by one. In the furnace where the temperature is high, the cold material such as steel bar cutting is used to adjust the temperature after the furnace to reduce the temperature of nitrogen in the furnace and improve the metal recovery rate. Increase the recovery of self-circulating slag steel, steel slag transport and screening. The continuous casting platform uses a special slag basin to collect all kinds of scrap steel and directly recycle it to the scrap bucket of the slag room.

Optimize production process

Make lean "key moves"

Combined with the test data of the quality measurement department, the steel mill tracks the product performance and controls the steel grade composition. Discuss Q195 aluminum block alternative with technical department and Quality Measurement Department, reduce deoxidation cost, and track the subsequent rolling situation and quality feedback. Through professional training, improve the level of component control, ensure the qualified rate of finished internal control components, and the normal furnace control range is within the internal control line.

Lean management is not a matter of overnight, steel plants standardize the converter steel alloy structure and the use of deoxidizer, in strict accordance with the operation points or technical requirements, strengthen the operation of steel, pay attention to the alloy, carburizing auxiliary materials, do a good job in slag operation, to save alloy, carburizing auxiliary materials to create good conditions. Pay close attention to the composition temperature of molten iron in the furnace, adjust the amount of scrap steel, prevent the phenomenon of low temperature after blowing, affecting the absorption rate of alloy and carburized auxiliary materials. Strengthen the operation of converter, increase the end point C content, reduce the oxidation of molten steel.

Enhanced equipment operation

Play a lean strategy to save energy

Steel mills strictly strengthen lean management, strengthen fine operation, further control energy consumption, and significantly improve energy efficiency. In terms of power consumption, pay attention to the peak-valley flat price, such as the production preparation section to make full use of the peak-valley flat price, and fill the silo during the valley period. Control the use of air conditioning in the high voltage distribution room, and gradually switch all lights to LED lights to eliminate idling during maintenance.

In terms of blast furnace gas consumption, the number of online ladle baking should be reduced under the premise of meeting the production requirements. In terms of nitrogen consumption, prepare the nitrogen sealing system transformation in advance. In the furnace with a large amount of slag, under the premise of ensuring the requirements of furnace protection, part of the slag should be poured out before splashing, so as to shorten the splashing time and reduce nitrogen consumption.

What is done is done, and what is done is done. Hebei Xinda Iron and Steel Group Co., Ltd. will always adhere to the problem-oriented, goal oriented, result-oriented, lean as the main line to stimulate the lean vitality of all employees, from the strengthening of production organization, detailed intelligent control, optimization of quality system and other aspects, continue to make up for weaknesses, strong and weak, adhere to management innovation to drive comprehensive innovation. Deepen reform, actively seek change, integrate lean management thinking into the whole process of production and operation management, the whole chain, and various fields, unswervingly carry the red flag, walk in the front, strive for the first, lean management as a new quality productivity, and strive for high-quality development of enterprises!

主站蜘蛛池模板: 菠萝蜜免费观看视频| 一本色道久久88加勒比—综合| 孕交videosgratis孕妇性欧美| 亚洲av无码专区在线观看成人| 特级xxxxx欧美孕妇| 人妻精品无码一区二区三区| 丰满少妇高潮惨叫正在播放| 天堂在线中文网www| 国产97色在线 | 国| 国产高潮视频在线观看| 夜夜躁日日躁狠狠久久av| 年轻女教师免费观看| 福利视频在线播放| 99久久国产综合精品成人影院| 丰满的妽妽用身体满足了我电影| 污18禁污色黄网站免费| 亚洲一卡2卡三卡4卡高清| 高清windows免费版| 国产亚洲av人片在线观看| 人妻少妇熟女javhd| 午夜精品久久久久久久99老熟妇| 大香伊蕉在人线国产免费| 日韩 欧美 亚洲 一区二区| 韩国三级中文字幕hd| 欧美freesex黑人又粗又大| 日本欧美一区二区三区乱码| 国产精品无码久久综合网| 翘臀后进少妇大白嫩屁股| 亚洲+日产+专区| 大香伊蕉在人线国产免费| 精品久久久久久无码国产| 亚洲日韩精品无码av海量| av无码久久久久不卡蜜桃| 性一交一乱一伦一色一情丿按摩| 人妻少妇被猛烈进入中文字幕| 色噜噜狠狠色综合av| 丝瓜视频在线观看免费| 青青草国产成人99久久| 17岁日本免费bd完整版观看| 吃奶还摸下面动态图gif| 欧美成人aaa片一区国产精品|